Sept 2021, Restoring from Bridge 4

Here are three Sept 2021 scenes by Steve Bonser, showing the Wendover Canal Trust volunteers restoring from Bridge 4. Four volunteers are preparing the remains of the second brick wall from the old Bridge 4 for rebuilding. The rebuilt wall can be seen behind. The hired excavator is being used to lift a 4 metre length of Bentomat lining onto the canal bank. The canal has been newly excavated to the correct profile.