August 2019’s 2-week work party: 1) Strengthened in front of the Bridge 4 mooring wall; 2) Top-soil on the excavated material beyond Whitehouses, so that it can be incorporated into the field which the County Council leases to the local farmer; plus 3) further excavation. Pictures by Chris Sargeant and Steve Bonser. Tony’s monthly report is below.