Tony Bardwell took the first 4 of these pictures during his initial site inspection for March’s work party. As a result he cancelled the first 2 days.
Then we had the real snow; the next 7 pictures were taken by Steve Bonser on Friday 2nd, which should have been the first day.
By Sunday 4th it was just fit for some scrub bashing, after which we managed to lay most of a length of bed lining. Note the dumper, which at 7 tonne capacity was the largest we’ve ever had (by Steve Sumner).