CRT Dredging to improve water flow
Good news – the first 4 pictures below show CRT’s dredging of the Wendover Canal on Friday 28/9/2018 near Stablebridge Road, Aston Clinton. This is in the unnavigable but in-water section of the arm, down which the water from Wendover must flow to reach the reservoirs, pump and main line.This appears to be much more […]